| STS-133: Crew gets suited up |
Date: February 25, 2011 Duration: 3 min 7 sec Space shuttle Discovery's astronauts -- all experienced veterans -- finish donning their day-glow orange ascent and entry spacesuits on launch morning. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Discovery's pre-launch campaign |
Date: February 25, 2011 Duration: 16 min 1 sec This narrated footage shows the preparations that shuttle Discovery underwent at Kennedy Space Center for launch to the STS-133 mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Payloads' pre-launch campaign |
Date: February 25, 2011 Duration: 11 min 14 sec This narrated footage shows the preparations that the STS-133 mission payloads underwent at Kennedy Space Center for launch to the International Space Station aboard Discovery. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Tower rollback time-lapse |
Date: February 23, 2011 Duration: 1 min 21 sec This time-lapse movie shows the gantry-like rotating service gantry retracting away from space shuttle Discovery at Kennedy Space Center's pad 39A on the eve of the ship's final flight. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Pre-launch news conference |
Date: February 23, 2011 Duration: 53 min 19 sec This is the pre-launch news conference for space shuttle Discovery's STS-133 mission to the International Space Station with the Mission Management Team chairman, the launch director, the launch payload manager and the shuttle weather officer. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Launch pad gantry rolled back |
Date: February 23, 2011 Duration: 6 min 38 sec The space shuttle Discovery is uncovered from the cocoon-like rotating service gantry for liftoff from Kennedy Space Center's launch pad 39A. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Countdown now underway |
Date: February 22, 2011 Duration: 20 min 41 sec NASA test director Steve Payne and launch weather officer Kathy Winters report on the progress of space shuttle Discovery's countdown and the weather outlook for liftoff in this briefing held Feb. 22 at 10 a.m. EST. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Inside Launch Control Center when the countdown began |
Date: February 21, 2011 Duration: 4 min The three-day countdown sequence begins for space shuttle Discovery inside Firing Room 4 of Kennedy Space Center's Complex 39 Launch Control Center. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Countdown preview |
Date: February 21, 2011 Duration: 19 min 28 sec NASA test director Jeff Spaulding and weather officer Kathy Winters provide an update on shuttle Discovery's launch preparations and preview the start of the three-day countdown sequence during this briefing held at 10 a.m. EST on Feb. 21. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Crew returns for launch |
Date: February 20, 2011 Duration: 4 min 9 sec Space shuttle Discovery's six astronauts arrive at the Kennedy Space Center launch site after an afternoon trip from their home base in Houston to prepare for liftoff.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Discovery cleared for launch |
Date: February 18, 2011 Duration: 50 min 59 sec After meeting at the Kennedy Space Center for the Flight Readiness Review and discuss exhausting analysis of the external tank cracks and repairs, NASA officials clear shuttle Discovery to fly to the International Space Station on Feb. 24. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Discovery awaits countdown |
Date: February 17, 2011 Duration: 1 min 12 sec This is some unique video footage of the space shuttle Discovery atop launch pad 39A in the days leading up to the countdown sequence starting. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Sun rises over spaceport after rollout |
Date: February 1, 2011 Duration: 1 min 21 sec The sun rises over the Florida spaceport with space shuttle Discovery now poised atop Kennedy Space Center's launch pad 39A for the STS-133 mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Shuttle Discovery arrives atop launch pad 39A for final time |
Date: February 1, 2011 Duration: 7 min 10 sec The space shuttle Discovery makes the overnight trip to launch pad 39A for a final pre-retirement mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Crowds cheer on Discovery's rollout |
Date: January 31, 2011 Duration: 3 min 10 sec Crowds of Kennedy Space Center workers and their families celebrate space shuttle Discovery's rollout to launch pad 39A for the ship's final mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Discovery re-emerges from VAB |
Date: January 31, 2011 Duration: 5 min 1 sec With the external tank repaired and strengthened, the space shuttle Discovery re-emerges from the Vehicle Assembly Building for rollout to launch pad 39A. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Replacement spacewalker Steve Bowen trains |
Date: January 28, 2011 Duration: 7 min 2 sec Steve Bowen dives into Johnson Space Center's gigantic swimming pool for a dress rehearsal of the mission's spacewalking tasks. He joined the astronaut crew just the week before this training session, after replacing the injured Tim Kopra, originally set to be Discovery's lead spacewalker. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Fresh foam applied to external tank |
Date: January 25, 2011 Duration: 1 min 52 sec Fresh insulating and aerodynamic foam is applied on space shuttle Discovery's external fuel tank's ribbed midsection after extensive work to beef up the support beams. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Root cause of tank cracks discovered |
Date: January 11, 2011 Duration: 54 min 42 sec NASA senior managers detail the results from lengthy testing, troubleshooting and analysis that determined the cause of space shuttle Discovery's external fuel tank cracking, the plans for resolving the situation and rescheduling the launch. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Launch team practices procedures |
Date: January 7, 2011 Duration: 3 min 41 sec The space shuttle launch team rehearsal countdown procedures in Kennedy Space Center's Complex 39 launch control center's firing room No. 4. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Next >> |