| STS-131 crew interviews: Rick Mastracchio |
Date: March 29, 2010 Duration: 18 min 56 sec This pre-flight interview talks with NASA astronaut Rick Mastracchio, mission specialist number 1 for space shuttle Discovery's STS-131 mission to the International Space Station.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131 crew interviews: Dottie Metcalf-Lindenburger |
Date: March 29, 2010 Duration: 34 min 1 sec This pre-flight interview talks with NASA astronaut Dottie Metcalf-Lindenburger, mission specialist number 2 for space shuttle Discovery's STS-131 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131 crew interviews: Stephanie Wilson |
Date: March 29, 2010 Duration: 23 min 2 sec This pre-flight interview talks with NASA astronaut Stephanie Wilson, mission specialist number 3 for space shuttle Discovery's STS-131 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131 crew interviews: Naoko Yamazaki |
Date: March 29, 2010 Duration: 26 min 49 sec This pre-flight interview talks with Japanese astronaut Naoko Yamazaki, mission specialist number 4 for space shuttle Discovery's STS-131 mission to the International Space Station.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131 crew interviews: Clay Anderson |
Date: March 29, 2010 Duration: 36 min 12 sec This pre-flight interview talks with NASA astronaut Clay Anderson, mission specialist number 5 for space shuttle Discovery's STS-131 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131: FRR news conference |
Date: March 26, 2010 Duration: 60 min 3 sec NASA officials announce the launch date for space shuttle Discovery's STS-131 mission to the International Space Station during this briefing at Kennedy Space Center following the Flight Readiness Review.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131: Flight Readiness Review |
Date: March 26, 2010 Duration: 2 min 33 sec Bill Gerstenmaier, NASA's associate administrator for space operations, recaps the agency's senior-level Flight Readiness Review that cleared shuttle Discovery for its April 5 launch date.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Issues assessed by managers |
Date: March 26, 2010 Duration: 5 min 12 sec Space shuttle program manager John Shannon describes the issues and technical concerns that officials had to assess in preparation to launching Discovery on the STS-131 mission.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Valve no constraint to launch |
Date: March 26, 2010 Duration: 1 min 26 sec Space shuttle program manager John Shannon explains the helium isolation valve problem aboard Discovery and how officials determined it was safe to launch without replacing the valve.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Launch director update |
Date: March 26, 2010 Duration: 1 min 26 sec Pete Nickolenko, the STS-131 launch director, gives an update on preparations at Kennedy Space Center's pad 39A for shuttle Discovery's countdown and liftoff.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Payload arrives at launch pad |
Date: March 19, 2010 Duration: 9 min 12 sec The transportation canister holding space shuttle Discovery's payloads for the STS-131 space station mission is driven to launch pad 39A and lifted into service gantry. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Interview with payload manager |
Date: March 19, 2010 Duration: 4 min 5 sec This is an interview with Joe Delai, the STS-131 payload mission manager, conducted at Kennedy Space Center's launch pad 39A with space shuttle Discovery as the backdrop. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Interview with Boeing manager |
Date: March 19, 2010 Duration: 4 min 27 sec This is an interview with Mike Kinslow, the Boeing payload manager, conducted at Kennedy Space Center's launch pad 39A with space shuttle Discovery as the backdrop. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: EVA suits loaded aboard |
Date: March 18, 2010 Duration: 7 min 27 sec The spacesuits worn by the astronauts while taking spacewalks outside the shuttle and International Space Station are packed inside Discovery for launch. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131: Canister goes upright |
Date: March 11, 2010 Duration: 8 min 27 sec The transportation canister hauling the Leonardo and ammonia tank payloads is taken to the rotating building at Kennedy Space Center and turned vertically for delivery to the launch pad.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| Can the shuttle program avoid looming retirement? |
Date: March 10, 2010 Duration: 9 min 38 sec Space shuttle program manager John Shannon answers reporters questions about Congressional efforts to extend the program well beyond the 2010 retirement deadline.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| What about adding one more shuttle mission? |
Date: March 10, 2010 Duration: 4 min 14 sec Space shuttle program manager John Shannon discusses the possibility of adding one additional shuttle mission -- STS-135 -- to the manifest in late 2010 before the planned retirement deadline.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131: Hoisting Leonardo into transporter |
Date: March 10, 2010 Duration: 4 min 10 sec The Multi-Purpose Logistics Module, named Leonardo, is placed into the payload transportation canister at the Space Station Processing Facility for the trip to launch pad 39A and installation into Discovery.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-131 pre-flight briefings: Programs |
Date: March 9, 2010 Duration: 53 min 37 sec Space shuttle program manager John Shannon and space station deputy program manager Kirk Shireman open the day of pre-flight news conferences previewing Discovery's STS-131 mission with this program perspectives briefing. They discuss various hot topics for both programs.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-131 pre-flight briefings: The mission |
Date: March 9, 2010 Duration: 72 min 18 sec A detailed preview of space shuttle Discovery's STS-131 mission that features the reusable Leonardo cargo module to deliver science research hardware and additional life support equipment to the space station is provided in this briefing with lead shuttle flight director Richard Jones and lead station flight director Ron Spencer.
|  |
| PLAY | | DOWNLOAD |  | Presentations (640x480) |  |  | Questions & Answers (640x480) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | Next >> |